Project Experience

Hamilton BMW
Our Client: A&E Construction.
Project specifications complete sitework package. Work includes cutting and filling, storm sewer, underground detention basins, sanitary sewer, water main and service new asphalt parking lots and road widing.
Contract Value: Over $1,300,000.00

Sicomac, Lincoln, Washington and Coolidge Schools in Wyckoff, NJ 
Our Client: The Conklin Corp.
Project specifications complete sitework package. Work includes cutting and filling, storm sewer, underground detention basins, forced sanitary sewer, water main and service new asphalt parking lots.
Combined Contract Value: Over $1,100,000.00

The Shoppes at North Brunswick  
Our Client: Associates Construction, Inc.
Project specifications complete sitework package. Work includes cutting and filling, storm sewer, wet basins, modular retaining walls, sanitary sewer, water main and service, new curbs new asphalt parking lots.
Contract Value: Over $4,029,000.00

Saint Elizabeth Ann Seton Parish Church  
Our Client: E. Allan Reeves
Project specifications complete sitework package. Work includes cutting and filling, storm sewer, underground detention basins, forced sanitary sewer, water main and service new asphalt parking lots.
Contract Value: Over $1.109,000.00

9 Finderne Ave.  
Our Client: Bridgewater Ventures L.L.C
Project specifications 6 acre sitework package including 40,000 cubic yards of earthwork, 30,000 Sy paving, underground storm sewer system and basins.
The schedule is demanding. Work must be completed by June 30, 2006. We were hired because of our reputation to get the project done on or ahead of schedule.Contract Value: Over $2,100,000.00

3 M Corporation  
Our Client: 3M Corporation
Project specifications complete operational control of the 45 acre mineral fines pile. Work includes cutting and filling of more than 3,000 cubic yards of material daily. Tiering, grading, erosion control basin maintainence , flumes and channels.
Contract Value: Over $1,500,000.00

Oradell School Oradell, NJ  
Our Client: Intergrated Construction Enterprises
Project specifications complete sitework package. Work includes cutting and filling, storm sewer, underground detention basins, forced sanitary sewer, water main and service new asphalt parking lots.</
Contract Value: Over $700,000.00

Eisenhower Middle School Wyckoff, NJ  
Our Client: VRH Construction
Project specifications complete sitework package. Work includes cutting and filling, storm sewer,sanitary sewer, water main and service new asphalt parking lots.</
Contract Value: Over $600,000.00

3 M Corporation  
Our Client: 3M Corporation
Project specifications A 45 acre site. Work includes cutting and filling of more than 600,000 cubic yards of material. Tiering , flumes and channels.
Contract Value: Over $4,000,000.00

3 M Corporation  
Our Client: 3M Corporation
Project specifications A complex site drainage and storm water improvement and management system. Misc. Site work, Erosion Control.
Contract Value: Over $3,000,000.00



North Brunswick High School Water Main Project
Our Client: North Brunswick Board Of Education
Project specifications This is a complete turnkey  Water Main System.  Special task include over 12 wet taps and inline valves. Segregation of two existing systems. Asphalt removal, and replacement.
Contract Value: Over $360,000.00



Metuchen Utilities Project
Our Client: The Shaw Group
Project specifications This is a complete turnkey underground utilities project consisting of,  Misc. Site work, Erosion Control, Underground Storm, Sanitary Sewer and Water Systems. Contract Value: Over $460,000.00



Anchor Health Facility
Our Client: W.S. Cumby & Sons
Project specifications This is a complete turnkey site work project consisting of, Earthwork of over 16,000 cubic yards, Misc. Site work, Erosion Control, Underground Storm, Sanitary Sewer and Water Systems. Asphalt removal and concrete removal, Grinding concrete on site to produce 2500 tons of DGA. Installation of new Asphalt Parking Lots, Curbs and Sidewalks and asphalt striping.
Contract Value: Over $740,000.00


Veronica Ave Medical Building 
Our Client: Gordon Construction
Project specifications This is a complete turnkey site work project consisting of, Earthwork of over 14,000 cubic yards, Misc. Site work, Erosion Control, Underground Storm, Sanitary Sewer and Water Systems. Installation of new Asphalt Parking Lots, Curbs and Sidewalks and asphalt striping.
Contract Value: Over $500,000.00


Centenary College New Residence Hall

Our Client: Windsor Constructors
Project specifications This is a complete turnkey site work project consisting of, Earthwork of over 10,000 cubic yards, Misc. Site work, Erosion Control, Underground Storm, Sanitary Sewer and Water Systems. Asphalt removal, Installation of new Asphalt Parking Lots, Curbs and Sidewalks and asphalt striping.
Contract Value: Over $540,000.00


Middlesex Long Term Care Facility
Our Client: Pravco
Project specifications Earthwork consisting of over 30,000 cubic yards of earth placement, Misc. Site work, Erosion Control, Underground storm and Sanitary Sewer Systems.
Contract Value: Over $455,000.00


McGuire Air Force Base C-17 Flight Simulator
Our Client: Ascend Construction Mgmt
Project specifications Site Grading Earthwork, , Underground Storm and Sanitary Sewer, Water mains, asphalt, curbs and sidewalks. This is a turnkey sitwork project
Contract Value: Over $449,000.00


Lycoming Lane
Our Client: East Brunswick Sewerage Authority
Project specifications site work, clearing, underground sanitary sewer main pipe, Dismantling of existing pump station, traffic control, select aggregate placement, asphalt, curb and sidewalk removal and replacement and grass restoration.
Contract Value: Over $350,000.00



Country Inn & suites
Our Client: Whiting Turner Contracting Co. 
Project specifications site work, grading of new parking lots, underground utilities, select aggregate placement, curbs, sidewalks, .
Contract Value: Over $825,000.00



Commerce Bank Bridgewater
Our Client: Adams Bickel 
Project specifications site work, clearing, Unique 48" RCP underground detention basin, underground utilities, select aggregate placement, asphalt, stripping and road signs.
Contract Value: Over $750,000.00


Commerce Bank Cranford 
Our Client: Adams Bickel 
Project specifications site work grading of land, underground utilities, select aggregate placement, asphalt, stripping and road signs.
Contract Value: Over $350,000.00


Commerce Bank Clark 
Our Client: Adams Bickel 
Project specifications site work grading, underground utilities,, select aggregate placement, asphalt, stripping and road signs.
Contract Value: Over $250,000.00


United Methodist Homes Route 206 road widening
Our Client: United Methodist Homes
Project specifications site work underground utilities, select aggregate placement, asphalt, stripping and road signs.
Contract Value: Over $200,000.00

East Brunswick Pumping Station
Our Client: East Brunswick Sewerage Authority
Project specifications consist of a complete and comprehensive retro fit of the existing pumping station.(New building by others, not in our contract), site work underground utilities, bypass pumping and as a added coordination challenge the existing station must remain active at all times.
Contract Value: Over $500,000.00

Marlboro Retail Center
Our Client: Century 21 Construction
Project specifications consist of a complete and comprehensive site work package including the (demolition of an existing building by others not in our contract),Clearing of trees and brush, site grading of land, complete installation of underground utilities, new curbs, sidewalks.
Contract Value: Over $1,900,000.00


Church & Dwight Corp. Headquarters Expansion, Princeton, NJ
Our Client: Berkowsky & Associates
Project specifications consist of a complete and comprehensive site work package including, removal of existing curbs, sidewalks and asphalt. Clearing of trees and brush, Grading of land, complete installation of underground utilities, new curbs, sidewalks and asphalt paving.
Contract Value: Over $2,500,000.00


Merrill Lynch Family Center, Hopewell, NJ
Our Client: CSR Construction
Project specifications consist of soil erosion control measures, complete site storm sewer system including all roof drains, new sanitary sewer system, installing a special reinforced turf fire lane, parking lot and ball court paving, concrete planters, Belgium block curbs, concrete brick pavers, sand play areas.
Contract Value: Over $650,000.00


SENIOR HOUSING, South Plainfield, NJ
Our Client: W. S. Cumby & Son
Project specifications consist of soil erosion control measures, clearing and grubbing of trees and brush, complete site storm sewer system including all roof drains, new sanitary sewer system, complete water system, site earthwork grading of land, new parking lot paving, concrete curbs, concrete sidewalks, stabilized fire lane and complete structural excavation and backfill.
Contract
Value: Over $520,000.00


Merck Chiller Building Expansion-Rahway, NJ
Addition to Chiller Building under development by Keating Building Co.
Project specifications include various site demo of concrete slabs and
asphalt, earthwork to achieve new site grades and contours, slab on grade responsibility. New asphalt and various concrete work. The $200,000.00 project was awarded in November and site operations have recently begun to facilitate a strict schedule.
Merck Chiller Building Expansion, Underground Utilities; Rahway, NJ
Chiller Building utilities under development by Binsky & Snyder Inc., Mechanical Contractor and Keating Building Co., General Contractor.
Project specifications include various earthwork and complex trenching with complete shoring for trench bank stabilization and dewatering to achieve the installation of new water main lines and chemical sewer lines. The $150,000.00 project was awarded in November and excavation has recently begun, on schedule.

650 College Road East; Plainsboro Township, NJ
Site development and utility contract through L. F. Driscoll Company for Aegis Property Group's new
144, 000 SF office building.
Project specifications include complete earthwork operations for the 13 acre site. Site storm, sanitary, domestic and fire water; establish new building platform; curbs, sidewalks, pavers and asphalt paving.
Merck Building 818; Rahway, NJ
Interior and exterior excavation and backfill contract with Durr Mechanical Inc.
Project specifications Provide all heavy equipment and manpower to perform excavation and backfill for underground interior mechanical and plumbing piping, including excavation and installation of special concrete structure 8 feet in diameter and 16 feet deep. The project is schedule sensitive and on-track.

All employees for Middlesex Trenching are OSHA Hazmat Certified in the event hazardous conditions are encountered.

Middlesex Trenching maintains a supply of various PPC and PPE on-site to minimize potential downtime caused by a hazardous conditions.



City of New Brunswick, NJ
A two-year contract until 2001 to perform scheduled and emergency underground storm sewer, sanitary sewer and water main repairs.
Project specifications Provide all necessary equipment and manpower to perform excavation, installation and backfill to repair underground utilities as required.

Middlesex Trenching is on call;24 hours a day; and will respond within two hours to ensure that essential services are restored as quickly as possible.

Bristol Glen; Newton, NJ
Bristol Glen is a new Assisted Living facility under development by The Henderson Corporation for United Methodist Homes of New Jersey.
Project specifications include sitework, earthwork, site utilities, curbs and paving.
$2,500,000

Nassau Inn; Princeton, NJ
Major site renovation project including excavation and complete site utilities.
The $250,000 contract was awarded to Middlesex Trenching by Durell Builders and Construction Managers. Site operations begin Mid-August, 1999.

Sunrise; Edgewater, NJ
Sunrise Assisted Living is a new assisted living facility under development by Suffolk Construction Co. of Boston, Mass.
Project specifications include site clearing, demo of various concrete slabs, relocation of various existing utilities, earthwork to achieve new site grades, installation of new underground utilities, new curbs, sidewalks and paving. The $600,000 project was awarded in early September and site operations have recently begun to facilitate a strict schedule.

Brunswick Square Mall, NJ
Awarded to Middlesex Trenching by Bartolo Capital
Project specifications involve existing underground utility repairs and relocations throughout the Brunswick Square Mall complex. Construction is now underway and ahead of schedule.